| 07.02.2007 |
PR:
Overseas Measurement
Wireless
smart metering provides theideal solution for locations where ... more |
|
| 07.02.2007 |
PR:
Energy Management in the Limelight |
| |
The
lime quarry at Barnetby uses the Schneider Electric PowerLogic
system to monitor all electrical parameters in real time.
PM700 series meters are used to monitor all main distrbution
boards. The energy management system also monitors distributed
water and gas supplies via a VHF radio system. The site approaches
2km in length and has over forty metering points.
Because the PowerLogic system incorporates multiple network
gateways the existing fibre optic computer network can be
used to return data back to a central server. Realtime displays,
alarms and reports are available to users throughout the
site using a web based interface via their desktop PCs.

Lime Quarry at Barnetby, Energy Management System |
| |
[minimise] |
|
| 07.02.2007 |
PR:
Software in the City Energy
management and load monitoring are an important function performed
by building maintenance teams ... more |
|
| 01.01.2007 |
NEWS:
Happy New Year!
Everyone here at JW
Instruments Ltd would like to wish you a happy and prosperous
2007 |
|
| 02.03.2006 |
PR:
Capturing the Current Market
Dewsbury
now uses Horstmann MeterLink ... more |
|
| 02.03.2006 |
PR:
A Bright Future for Smart Metering!
New Smart Meters with
built in mobile technology from Iskraemeko offer... more |
|
| 02.03.2006 |
PR:
Keeping an Eye on Students' Consumption
Samara plaza student
accomodation in Leeds uses MeterLink Mainscom1... more |
|
| 01.07.2005
|
PR:
MeterLink Customers Don't Get Cold Feet
James Nesbitt at the
Hollicarr's opening... more |
|
| 01.07.2005
|
PR:
Pilot Project
Horstmann MeterLink
has been adopted by one of Britains internation airports...
more |
|
|
01.07.2005 |
|
|
PR
= Press Release
Please check back for further releases. Thanks |